rosy progress report / september 4

We’ve been hard at work pulling apart miss Rosy the Argosy, and I realized that I don’t really have an update here, just on social. Let’s take a look at the state of things shall we? Here is a progression of what we’ve done so far:

We’ve pulled out the following:

  • Five divider walls (1 wall-dining to kitchen, 2 walls-kitchen to bedroom, 2 walls-bedroom to bath)
  • Both twin beds
  • Upper cabinets above beds
  • Various brackets and metal framework

It took us two full days over two weekends to do all of that werk werk werk werk werk. In the Texas heat, y’all. At least we plug in the trailer and run the AC while we work.

Demo day on TV consists of folks smashing up cabinets with a sledge hammer, and pulling wreckage to the curb to be picked up by a disposal company. Demo day in real life, when you don’t have a Hollywood budget and have to be careful about the frame, walls, and windows of your camper, consists of hammering or drilling out rivets one by one, and removing hundreds of screws individually. We are replacing all of the particle board pieces with real wood, so we are being careful not to damage any pieces so that we can use them to measure. I REALLY don’t want to do the math it would take to measure out those Airstream curves.

We feel like we’re making pretty good progress! It’s hard doing our nine-to-fives and school all week when all we want to do is be working on Rosy! Gotta pay that reno bill, though, ya know?

Anyone have any reno stories to share? Post ’em in the comments, we’d love to hear from you!

talk to me, baby

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s